Look here for the annual Summer paving schedule!
2023 PAVING PROJECT
This year’s paving project includes the following roads:
Alpha Avenue
Beta Avenue
Cappa Avenue
Sholly Avenue
Willow Lane
Maple Lane
Oak Lane
Sycamore Lane
Greenwood Drive
Parkway Drive
2023 STORMWATER SLIP LINING PROJECT
The Township has contracted with Mr. Rehab to perform some stormwater relining and inlet rehabilitation. The following roads will be impacted:
Kochenderfer Road
Sandhill Road
Sycamore Lane
Poplar Lane
Cypress Lane
Redwood Lane
The township will also be slip lining several pipes that are not within the streets. Theses are are located within our storm sewer easements are mostly situated on the boundary line between two properties or along rear property lines.
Be aware that line striping will occur later this summer. Do NOT drive over wet paint, as this may impact your vehicle. Paint removal from your vehicle is at your cost. Stay alert and drive with caution!